PROJECTS

PROJECT DETAILS

  • CLIENT :
  • LOCATION :
  • PRIME CONTRACTOR :
  • Old Navy
  • Houston
  • Weekes Construction, Inc

Scope and Key Personnel

IS2'S Key Personnel
Lead Foreman/Master Electrician

Played a crucial role in supervising the complete electrical system upgrade to ensure all installations met the highest standards.

Project Manager

Responsible for procuring goods, managing vendors and client communications, and ensuring the project was completed flawlessly on time and within budget.

Electrician Teams

2 Journeyman Electricians (foremen) and 4 Apprentice Electricians rotating between 4-6-man crews.

Scope of Work

Comprehensive electrical system overhaul including demo and new installations for tenant space, low voltage vendor installations, exterior signage power, owner-furnished light fixtures, unistrut and threaded rod installation, underground trenching, conduit installation, floor boxes, rooftop unit power, and temporary power and lighting.

Project Description

IS2 LLC undertook the electrical work for Old Navy's new tenant space, which involved disconnecting and safely removing existing electrical components, salvaging reusable parts, installing a new electrical system, and providing a temporary power solution crucial for operating equipment, ensuring safety through adequate lighting, enabling the testing of installed systems, improving work efficiency, and offering flexibility to scale power needs. The scope of work included all tenant wiring, power receptacles, electrical equipment, and conduits with pull strings for low-voltage installations. We also provided power for exterior signage and blade signs, installed owner-furnished light fixtures, and furnished all necessary unistrut and threaded rods. Additionally, the project required underground trenching, conduit installation, floor boxes for cash-wrap and self-checkout areas, and powering rooftop A/C units.

Overcoming Challenges

Challenges: Sales Floor Delays

Our team encountered several issues that delayed the installation of lights and unistrut in the 10,000 square foot sales floor by two weeks. These challenges included:

  • Mechanical RFIs (Requests for Information)
  • Flooring rework
  • Light fixture delivery delays
Solutions Implemented

To overcome these challenges and get the project back on track, our team implemented the following solutions:

  • Lean Construction Practices: Minimized waste and ensured each step added value.
  • Effective Communication and Planning: Maintained close communication with the general contractor and strategically allocated our workforce to critical areas.
  • Technological Integration: Utilized advanced scheduling and project management software to keep the project on track and within budget.

Results

The Old Navy project stands as a testament to IS2 LLC's ability to manage complex electrical installations under challenging conditions. We delivered exceptional results through meticulous planning, skilled execution, and a commitment to safety.

Project Highlights
  • Timely Completion: Careful planning and resource allocation ensured the project finished on schedule.
  • High-Quality Work: The new electrical system was installed with precision, meeting all client specifications.
  • Client Satisfaction: Their satisfaction is a measure of our success and a reflection of the efficiency and quality of our work, encompassing innovative solutions and meticulous execution.
  • Lean Practices and Efficiency: Strategic use of Lean Construction Practices minimized waste and maximized efficiency, contributing to a smooth and cost-effective project.
  • Safety and Compliance: The project involved approximately 3,000 man-hours without accidents. Our team thoroughly analyzed near misses and effectively implemented preventive/corrective actions, resulting in zero quality issues or standard discrepancies.